Patching concrete floor after rough plumbing for toilet

The joist was cut to make room for the pvc waste pipe for the toilet. This is what i ended up doing after some research and opinion asking. Homewyse uses the unit cost method along with the latest cost data to. Concrete slab repair for plumbing trench concrete, stone. Roughin plumbing is, as its name suggests, basically a rough draft of your plumbing installation. Similar products, such as sakrete flocoat, are available. Cut the underside of the break as well to make a firm ledge. Create a sliding storage system on the garage ceiling. The plumbing is done, and now im ready to repair the slab. I have probably 2030sq ft of concrete basement 4 slab that needs to be patched after rough plumbing work. I intend to use a flange that can be glued inside the 4 pvc for the toilet.

Music in this video may be used from epidemic sound. As part of a kitchen remodel in our 1887 house, were adding a halfbath, using antique plumbing fixtures. Consider reflooring the whole bathroom and closet if the main floor is sheet vinyl, as patching in a new piece can leave a prominent seam. Removing the existing plumbing leaves holes in the. Removing the existing plumbing leaves holes in the floor that must be filled. The cooler the weather, the longer the curing time. For a longlasting repair, pay close attention to the edges and the mix. There is a 3 floor drain near the washer dryer, as well as a 1. Basic materials for radiant floor heat installation in a slab. Repairing a severely rotted subfloor extreme how to. Are you looking for the best sewer line installation and repair services in. When the subfloor is concrete, as is often the case with basement bathrooms or other slab foundation situations, replacing the flange is no easy matter, since it can be quite hard to drill holes in concrete to secure the new flange.

We have a 1904 toilet with a tank that hangs on the wall not a high tank, though. Considerations cutting through a concrete floor should be a last resort. Fill the area around the drain with new concrete, covering the flange and bolts. The areas you drilled and then broke off are considered rough. The temperature of the existing concrete must remain above 50 degrees for the first 24 to 48 hours after the patch is. I want to at the very least install a shower and probably a toilet too.

After the drain relocation was done i put the sand back in, compacted it. Fill any cracks or holes in the concrete floor with compound, using trowel to push it into any depressions. Quikrete concrete patching compound is a ready to use trowel applied acrylic latex formulation for crack and spall repair for concrete, stucco or masonry walls, sidewalks, patios, driveways, etc. Fast patch concrete repair simply mix with water and trowel. Concrete repair and repair products the concrete network. Installing closet flange on concrete floor 3 answers im installing a basement bath and have a ceramic floor installed up right around a 4 inch pvc soil drain for my toilet. How to clean laminate flooring installing vinyl flooring over ceramic tile. Mix up some concrete mix in a bucket until you have a thick, creamy mixture. Well, the contractor walked midjob, so ill be gcing after all. A concrete floor is a good base for laying ceramic tiles, provided it is level and free of cracks or abrasions. Install a fiberglass shower stall over a concrete floor with a special drain assembly that stops. The temperature of the existing concrete must remain above 50 degrees for the first 24 to 48 hours after the patch is applied.

So he jack hammered up the floor, then dug a bit more as is common, then he discovered that. Wait at least 24 hours before walking on the patch and a week before driving on it. Drywall joint compound and seam tape joins the seams between old and new drywall, and a light sanding blends the repair. Sewage lift station vented is 3 ft from 4 styrofoam plug toilet, 4 ft from 1 12 inch cast male pipe end extending through floor lav, have already added vertical vent pie to the lav drain at this point, and 12 ft from cast iron floor drain. Chisel all the loose concrete edges so there is an undercut. Common basement plumbing challenges september 9th, 20 by. I also had to break up footings in a few locations as well. Selfleveling compound can be purchased at your local home improvement store and applied to the concrete floor prior to tiling. Especially since rough in plumbing is just a stepping stone to the larger plumbing installation. Basement bathroom roughin connecting to 3 floor drain. How do i diagnose and repair cracks in ceramic tile covered slab in a nearlynew home. Remember, since you will only have 1 chance to pour the concrete slab, you will only have 1 chance to put the pex tubing in it. In the case of your sink and tub additional pipes are connected to route to the fixtures but because the toilet mounts to the floor of the bathroom a flange is placed on the floor allowing the waste pipe to be attached from below and.

Once the concrete is out, you can dig in the remaining trench to remove the sand or soil before running the new plumbing. Normally, the outer walls are roughframed before plumbing and. The roughin here means that all water supply and sewer pipes have been run through dull holes in the studs and other framing members and that all. If the surface of your floor is cracked or rough, mix concrete patch compound, following package directions. You will be pouring a little over existing floor but not much and feather flat. Planning a basement bathroom has some unique considerations that are different from other. Mix up a stiff batch of resurfacer, using just enough water for a workable consistency. As you put the sand in moisten it and tamp it down.

During new construction, the builder installs drain lines and stubs that will connect to future plumbing fixtures before he. How to repair a butchered floor joist fine homebuilding. I used a concrete saw to score the trenches and then a jack hammer to break the concrete. I added additional cement to the concrete mix to give it more strength. The new pipe must be installed with a downward slope of onequarter inch per foot, which should be. How to repair a hole in the floor of a slab foundation home guides.

While we were talking, i asked how easy it would be to rough in drains for a bathroom. For a tile floor, use thinset mortar, tiles that match the bathroom floor, and grout. If your floor surface is smooth, skip to the next step. Set time is 510 minutes and is ready to paint in 30 minutes. Temperature changes, heavy weights, and dropped objects can all damage your concrete floor by causing cracks and holes. How to replace a shower drain in a concrete slab hunker. Get uptodate, cost guide estimators for over remodeling and improvement jobs. Chip out loose and weak concrete with a cold chisel. Most of the trench edges have 12 inches of smooth saw cut with the rest of the edge jagged. How to changing the location of your bathroom toilet. Eleven years later i find the toilet, flooring and subfloor all failing because of the sag in the floor, created by sawing through an ibeam joist that runs the length of the house, tackitybits says in a post at fine homebuildings breaktime forum. Im pouring concrete over rough plumbing enter image description here. To connect your toilet, tub and sink to this line a smaller line will pass through the floor of the bathroom. Use the flat metal trowel to smooth the new concrete flush with the rest of the concrete floor.

Remedial work a severely dropped andor cracked floor slab may need digging up and completely relaying. Converting cast iron floor drain to shower drain plumbing already roughed into the floor in 1976. My renovating buddy mike holmes of restovate in toronto before he went on tv was into the creation of a new basement suite so i asked him to show us as he cut in for the rough plumbing for the toilet. Any minor over spread can be smoothed off with a sander. Measure 12 inches outward from that center point, and then, on the floor, make another mark at this distance.

Basement bathroom addition concrete question i had a plumber come talk to me about a minor repair needed to our main floor drain in our basement. When working with the wet concrete, strike it gently with the flat side of the trowel to help bring the moisture to the. Patching concrete slab after plumbing work i am a moderatelycapable diyer, but i hired a contractor for this job because my life is more busy than usual at this time. Construction updates expanded shakopee high school. Once you get started, you must keep following the path of the waterborn destruction until you reach the full. Bathroom plumbing diagram concrete slab plumbing installation. If the pvc drain indicates the age of the plumbing and the house, or at least when the slab was installed, there should be a layer of poly acting as a moisture barrier in between the concrete and gravel.

From there, the pipe runs under the floor and out to the city sewage system under the street. How to install a new toilet flange on a concrete slab. The height of the concrete should gently slope from 212 around the outside of the form to 114 near the drain. Start brickwork on exterior radius wall south of new auditorium. While concrete is a strong construction material, it can still crack. There are various products around for patching areas of damaged concrete. Retrofit a floor with a floor drain by using a hammer and chisel to break away the concrete to form the drain trenches. How should i fill in a hole in slab around floor drain.

Concrete patch in bath remodel for plumbing pipes youtube. I am perplexed to how the plumber would have glued the drain down before concrete was. The classic example would be a house built in the 1950s where the floor has risen up in the middle of the living room. Subscriber discounts on flooring, soundproofing and more. Scrape off the excess so repairs are flush with the surrounding floor. Patching concrete slab after plumbing work concrete. For a bathroom floor repair, either concrete will perform just as well as the other. How to repair a hole in the floor of a slab foundation. Unlike websites reporting aggregate historical prices that lack specific job details and accuracy, homewyse cost estimates are based on the unique requirements of your job, based on your job size, your job options and your location. How to plumb a basement bathroom the family handyman. Mechanical and plumbing rough in work for simulation lab.

How to install a basement bathroom awesome quick tips by home repair tutor duration. Basement bathroom roughin connecting to 3 floor drain tips. This causes the concrete floor to expand and push upwards, crack and bulge like a small mound. The plumber went to install it yesterday and discovered that i measured the rough in wrong. If concrete were poured against the rough parts, it would conform to. To estimate the amount you need, check the label and then buy two or three extra containers. After the forms have been set for the new drain system in the floor, pour new concrete and allow it to dry. Generalpurpose floor leveling product for concrete and masonry surfaces. I believe it is a slab on grade foundation typecommon in this area. Prep work and pour concrete floor for new auditorium amenity spaces.

Be sure to remove enough concrete from the area just before the drain pipe to fit a drain trap in line. Roughingin the plumbing for a basement bathroom is a big job, but the. A heavyduty wet saw is necessary for cutting through a concrete floor. To install a basement drainpipe that will service a toilet, sink, and shower, the concrete floor surrounding the main sewer line must be broken up and removed so a trench can be dug. The demolition stage of repairing a rotted section of subfloor is like cancer surgery. The homeowner had recently completed some plumbing upgrades, which took care of the water source for the rot, but the floor damage was already done.

Ideal for patios, sidewalks, garages and for preparing surfaces for vinyl sheet good installation. Patching concrete floor after rough plumbing terry love. How to back fill and pour new concrete in your basement. Determine where the toilet is going to be positioned and mark its center on the wall.

How to cut a concrete floor for new plumbing home guides. When replacing a toilet, its fairly common to discover that the existing toilet flange will not work for the new toilet. Anchor a form board against the side of the step, moisten the area and pack in the repair mix. Many remodel projects in homes with a concrete foundation and slab call for moving plumbing fixtures, such as toilets, sinks and floor drains. Square off the edges of the broken step with a masonry blade. It took about 25 bags of 60 pound concrete mix to fill and repair the new bathroom floor. We bought a house two years ago, after it sat empty as a model home for a few years, so now its about five years old.

So even if there are no existing plans for the radiant floor heating or a snow melting system, installing pex tubing in it may turn out to be a good decision. Common basement plumbing challenges best pick reports. For a texture, pull a damp push broom over the concrete. But adding a fullfunction basement bathroom is no easy project.